Construction bid template: how to write a bid that wins
Affiliate link: we may earn a commission if you sign up, at no extra cost to you.
A construction bid is your price for building what someone else has already designed. The owner or general contractor sends out plans, specs and a deadline. Every bidder prices the same work. On public sealed bids, the job generally goes to the lowest bid that follows the rules, and that last part is easy to underrate. A good number on a sloppy bid form can still get thrown out.
So a bid has two jobs. It has to carry the right price, and it has to answer exactly what the bid invitation asked for. In practice that means your company details and license, a base bid, and any alternates or unit prices they asked for. Add your exclusions and the addenda you received. Then say how long the price holds, attach a bid bond if one is required, and sign it.
You can build that page with our free general contractor quote template. Change the heading to Bid, put the project name and bid due date at the top, and use the line items for the base bid and each alternate. It fills in on screen and saves as a PDF, with no sign-up.
Bid, proposal or quote?
A quote or a proposal is usually your own plan and your own price, written for a customer who asked you over. A bid answers someone else's documents. You don't get to decide the scope. You price theirs, on their form if they supply one, by their deadline.
That changes how you write it. In a construction proposal you spell out the scope in detail because you're the one defining it. In a bid, the plans and specs already define it, so you point to them by sheet number and spec section, then list anything you're not including. Keep the scope description short and the exclusions sharp.
What goes in a construction bid
1. Header and bidder details
Your business name, address, phone, email and contractor license number. Then the project name and address, who you're bidding to, the bid date, and the plan set and spec book you priced from, with their dates. If the plans get revised after bid day, that line shows which version your price was based on.
2. Base bid
The base bid is your lump-sum price for all the work shown in the documents. Write it in figures. Some bid forms ask for it in words as well. Most bid forms ask for one number here, not a breakdown. Some private owners and general contractors want a schedule of values behind it, so check the invitation.
3. Alternates
Alternates are priced options the owner may accept or reject. An add alternate puts money on top of the base bid for extra work. A deduct alternate takes money off for leaving something out or swapping in something cheaper. Price each one exactly as described and show whether it's an add or a deduct. Read the instructions on blank alternates. Some invitations treat a missing price as an incomplete bid, so if you won't price one, do what the invitation says.
4. Unit prices
Some bids ask for a price per unit for quantities nobody can know ahead of time, like rock excavation per cubic yard or drywall patches per each. These get used later to price changes. Don't lowball them to look cheaper. If quantities run high, you'll be doing that extra work at that rate.
5. Allowances
If the documents carry an allowance, such as a fixed sum for hardware or signage, include it in your base bid at the amount stated. Don't adjust it. Say in your bid that it's included.
6. Clarifications and exclusions
List what's not in your price. Common ones: permits and fees if the owner pays them, testing and inspections by others, winter heat, hazardous material removal, and work by other trades. Keep it to real gaps that the documents leave open. On federal sealed bids, FAR 14.404-2 says a bid must be rejected if the bidder imposes conditions that would modify the requirements of the invitation. State and local rules vary.
7. Addenda received
Addenda are changes issued during bidding. List every addendum by number and date. On federal jobs, the bid provision at FAR 52.214-3 says bidders must acknowledge each amendment. You can sign and return it, list it on the bid form, or send a letter. The acknowledgment has to arrive by the bid deadline. Miss one and your bid may be rejected, though FAR 14.405 lets the contracting officer waive it in narrow cases, such as when the amendment barely affects price.
8. How long the price holds
State the acceptance period, such as 60 or 90 days. Material prices move, and the owner may take weeks to award. If the invitation sets the period, use theirs.
9. Bonds and insurance
Public jobs often require a bid guarantee, usually a bid bond from a surety. Under the federal rules (FAR 28.001), a bid guarantee assures that you won't withdraw your bid during the acceptance period and that you'll sign the contract and furnish the required bonds if you win. On federal work the bid guarantee must be at least 20% of the bid price, capped at $3 million (FAR 28.101-2). On a $400,000 bid that's at least $80,000 of bid security. In sealed bidding, leaving out a required bid guarantee generally means the bid is rejected (FAR 28.101-4).
If you win a federal construction contract over $150,000, the federal bond statute once called the Miller Act requires performance and payment bonds (FAR 28.102-1). Many states have similar rules for state and local public work, with their own thresholds, so read the bid invitation. Talk to your surety before bid day, not after.
Also add a line saying you'll provide a certificate of insurance at the limits the documents require.
10. Signature
Sign it with the name and title of someone who can bind the company, and date it. An unsigned bid can be rejected, and that's a painful way to lose a job you priced right.
Worked example: interior painting bid
Example numbers only. Your labor rate, production rates and markup will differ.
Say a painting contractor is bidding a 6,000 square foot office repaint to a general contractor. The invitation asks for a base bid and one add alternate: paint the exposed ceiling deck in the open office area.
| Line | Qty | Rate | Amount |
|---|---|---|---|
| Labor: prep, prime, two finish coats | 160 hr | $55.00 | $8,800.00 |
| Paint, primer and sundries | 1 | $2,350.00 | $2,350.00 |
| Lift rental | 1 | $600.00 | $600.00 |
| Cost subtotal | $11,750.00 | ||
| Overhead and profit (20% markup) | $2,350.00 | ||
| Base bid | $14,100.00 | ||
The alternate is priced the same way. Forty more labor hours at $55 is $2,200, plus $500 in material, for $2,700 in cost. With the same 20% markup, Add Alternate 1 is $3,240.
On the bid form, the general contractor sees only this:
- Base bid: $14,100.00 (fourteen thousand one hundred dollars)
- Add Alternate 1, paint exposed ceiling deck: add $3,240.00
- Addenda received: No. 1 dated Nov 3, No. 2 dated Nov 7
- Excludes: wallcovering removal, patching beyond normal prep, after-hours work
- Price good for 60 days from bid date
Notice the markup. A 20% markup on cost works out to about a 16.7% margin on the selling price ($2,350 of $14,100). If you think in margin and price in markup, or the other way around, you'll come in low without meaning to. Check yours with the markup vs margin calculator, and work out your true labor cost first with the labor burden calculator.
Sending bids and following up without a spreadsheet
Most bid work still goes out as a PDF on the owner's form. Where a quoting app earns its keep is the private and residential work in between, where you're sending lots of prices and chasing answers.
Jobber is field service software with quoting built in. Its quoting page says you can set markups on labor and materials inside the quote, offer optional add-ons, and have it follow up automatically on quotes that go quiet. Customers can approve, ask for changes or pay a deposit in its client hub. It won't fill in a public agency's bid form for you, so it fits best if most of your prices go straight to property owners.
The 14-day free trial needs no credit card, according to Jobber. Sign up through our link and you also get 20% off your first 6 months.
Try Jobber free for 14 days (opens in a new tab)
Mistakes that get bids thrown out
- Showing up late. On federal sealed bids, FAR 14.304 says a bid received after the exact deadline is late and won't be considered except in narrow cases. Private bid deadlines are usually just as firm.
- Forgetting an addendum. Call the plan room or check the bid portal the day before bids are due.
- Leaving an alternate or unit price blank.
- Adding conditions that change what the documents ask for.
- No bid bond, or a bond for the wrong amount.
- Math errors between figures and words. Read it back before you sign.
- Pricing from an old plan set. Write the plan date on your bid.
A low number gets you looked at. A clean, complete bid gets you the job. Federal rules, for example, say award goes to the responsible bidder whose bid conforms to the invitation and is most advantageous to the government on price and price-related factors (FAR 14.408-1). Private owners can weigh other things, but a bid that ignores the form rarely helps.
Once you win, track your real costs against the bid with the job costing calculator. That's how your next bid gets sharper. And if the scope changes mid-job, write it up on a change order before doing the work.
This article is general information, not legal advice. Federal rules quoted are from the Federal Acquisition Regulation (FAR) as published on acquisition.gov in November 2026. State, local and private bid rules vary, so follow the bid invitation and check with your surety or a lawyer on anything you're unsure of.